Dredge Gamboa awaiting passage through Monte Lirio Bridge for work on the Trans-Isthmian Pipeline through Gatun Lake.  The Dredge Gamboa was a sister dredge to the Cascadas and Paraiso dipper dredges.   Monte Lirio Bridge is preparing to lift it's lift section.  The large counter weight can be seen on the bridge.


Back